A new building or addition needs a roof assembly coordinated with its structure, slope, drainage and intended use. The covering is only one part of that design.
Choose a coordinated roof assembly
Selecting shingles, panels or a membrane does not settle the support, underlayment, attachment or flashing detail. Connections with walls, openings and other trades need to be resolved too.
Review plans, project stage and design responsibilities
Discuss the plans, project stage and responsibility for design and approvals. Identify who will coordinate roof openings, equipment and adjacent construction.
Specify layers, interfaces and required approvals
Name the proposed layers and connections, the required preparation and the inspection or approval responsibilities. Resolve unclear boundaries between trades before work is ordered.
Compare equivalent new-construction scopes
Compare proposals against the same project requirements and responsibilities. Confirm provider acceptance and scheduling for the actual new-construction scope.
A product name and a project scope are different things. Compare the existing assembly with the proposed removal, retained components and connections that need attention.
Separate the new covering from the complete roof scope
A covering-only price cannot be compared directly with a quote that includes new sheathing or rebuilt flashing. New construction also needs coordination with the framing and other trades; an existing-roof replacement starts with what can be retained.
What to look for in the written scope
- Existing layers to be removed and the proposed disposal arrangements.
- Named products and assembly details, including roof slope and attachment.
- A documented method for pricing concealed deck repairs and approving changes.
Useful questions for the call
- What do the plans require?
- Who coordinates roof interfaces?
- Which design and approval responsibilities are included?
Call (877) 854-0330 with the property ZIP code and the concern you want to discuss. Ask whether an independent provider accepts this work for the address and confirm any assessment charge or scheduling terms.
For the component relationships and questions to compare the proposal, read the related roofing guide.